Construction and handover cleaning

Construction cleaning during and after the works.

Building and finishing work continually creates new contamination. Purion cleans released construction areas, from interim dust removal to cleaning after a particular work phase. We take care of new materials and work around other trades and site progress. The final clean for formal handover has its own agreed scope, timing and standard.

Removing construction dust with a professional vacuum
Cleaning method and materials
01

Interim cleaning and construction dust removal

We remove construction dust and agreed contamination from accessible floors and surfaces. Stickers, protective film and suitable adhesive residues can be included where the material and finish allow. Tasks vary by area and project phase. We establish which rooms are available and which cannot yet be cleaned.

02

Care for new finishes

New floors, glazing and other finishes need an appropriate method. Not every surface can be scraped or treated with the same cleaning product. We consider material information and protect neighbouring areas. Stubborn residues or visible damage are discussed before further treatment takes place.

03

Work by area or project phase

A project may need several cleaning rounds, for example by floor or released room. We align with the site programme and agree access and facilities with the contact on site. Collecting waste, preparing it for removal and transporting it away are different tasks; the assignment specifies which are included.

04

A clear transition to the final clean

Interim construction cleaning differs from the last clean before formal handover. Once an area is ready for transfer, the separately defined final clean can take place. We check cleaned areas after each agreed phase. New contamination caused by subsequent work is addressed in the next scheduled round or an additional assignment.

Good to know

Questions about construction and handover cleaning

Is construction cleaning the same as handover cleaning?

No. Construction cleaning supports the project during or after individual phases. Handover cleaning is the one-off final clean before transfer or occupation, with a defined result.

Can construction waste be removed as well?

This can be included in the assignment. We distinguish collection, preparation for removal and removal itself, and specify the waste and facilities involved.

FROM REQUEST TO EXECUTION

First the location. Then the final quote.

Tell us which services you need. We discuss your request and inspect the location. Your final quote specifies the work, frequency and price. During execution, we check quality and report on agreed actions.