Handover cleaning

Handover cleaning that reveals the finished work.

Once construction or renovation is complete, the space should be ready for a clean handover. Purion carries out the one-off final clean of the premises or agreed building sections. We remove construction dust and suitable residues and clean floors, glazing, washrooms and interior fittings, with care for the finish and a check before transfer or occupation.

Final cleaning before handover
Cleaning method and materials
01

Define the handover standard

Terms such as swept clean, handover clean and ready for use can mean different things. We describe what the final clean covers on your project, identifying surfaces and components by room or area. This gives the client and those carrying out the work the same reference, rather than different expectations of the word clean.

02

From visible surfaces to finishing details

We clean agreed floors, glazing, frames, doors, washrooms and accessible interior fittings. Construction dust on edges and other visible details receives focused attention. Suitable film, sticker and adhesive residues are removed as agreed. Material and finish guide the method; damage is not contamination and is not silently treated as a cleaning task.

03

Prepare for a careful final round

Final cleaning works best once the relevant areas have been released and are accessible. We agree when other work will stop, what protection must remain and who makes each area available. Collection and removal of agreed waste can be specified separately. Larger projects can be cleaned by floor or zone, with an individual handover point for each section.

04

Check before handover

Following the clean, we review the agreed items and discuss relevant observations with the site contact. A missed detail is corrected within the assignment. Contamination created by new work afterwards requires a further round or additional agreement. This keeps the result of the completed handover clean clearly defined.

Good to know

Questions about handover cleaning

When should handover cleaning be scheduled?

After work in the relevant area is complete and before the agreed transfer. For phased handovers, each area can have its own cleaning and inspection time.

Are all adhesive, paint and cement residues removed?

We identify the residues in advance and establish whether they can be treated without unacceptable risk to the finish. The proposal records the agreed work.

FROM REQUEST TO EXECUTION

First the location. Then the final quote.

Tell us which services you need. We discuss your request and inspect the location. Your final quote specifies the work, frequency and price. During execution, we check quality and report on agreed actions.

Request a no-obligation quote
Request a no-obligation quote